In operation Conventional rail 100% verified sheet
Absheron Circular Suburban Railway (Baku–Sumqayit Stadler Kiss) & Baku–Ganja–Gabala Express (ADY)
Baku / Sumqayıt / Ganja / Gabala · Baku / Absheron / Ganja-Dashkasan / Shaki-Zagatala (Península de Absheron e Corredor Leste–Oeste do Azerbaijão) — Azerbaijão
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Azərbaycan Dəmir Yolları (ADY)
- Opened
- 1880
- Operational/planned length
- 2,140 km
- Lines
- 6
- Stations / Stops
- 176
- Weekday ridership
- 35,000 (2025)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Anel Suburbano de Absheron (Baku – Biləcəri – Sumqayıt – Pirşağı – Sabunçu – Baku) e Tronco Expresso Baku – Yevlakh – Ganja – Agstafa (In operation)
Stations / Stops (1)
- Estação de Sumqayıt e Ganja (Hubs dos Trens Elétricos de Dois Andares Stadler Kiss ADY) · Anel Suburbano de Absheron e Expresso Baku–Ganja
Editorial coverage
No specific articles linked yet.