In operation Conventional rail 100% verified sheet

Absheron Circular Suburban Railway (Baku–Sumqayit Stadler Kiss) & Baku–Ganja–Gabala Express (ADY)

Baku / Sumqayıt / Ganja / Gabala · Baku / Absheron / Ganja-Dashkasan / Shaki-Zagatala (Península de Absheron e Corredor Leste–Oeste do Azerbaijão) — Azerbaijão

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Azərbaycan Dəmir Yolları (ADY)
Opened
1880
Operational/planned length
2,140 km
Lines
6
Stations / Stops
176
Weekday ridership
35,000 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Anel Suburbano de Absheron (Baku – Biləcəri – Sumqayıt – Pirşağı – Sabunçu – Baku) e Tronco Expresso Baku – Yevlakh – Ganja – Agstafa (In operation)

Stations / Stops (1)

  • Estação de Sumqayıt e Ganja (Hubs dos Trens Elétricos de Dois Andares Stadler Kiss ADY) · Anel Suburbano de Absheron e Expresso Baku–Ganja

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.