In operation High-speed rail 100% verified sheet

Cairo–Alexandria Talgo Fast Rail (160 km/h) & Capital Train Electric Railway (Cairo LRT 120 km/h)

Cairo / Nova Capital Administrativa / Alexandria · EG (Grande Cairo, Nova Capital Administrativa e Corredor Cairo–Alexandria) — Egito

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
ENR (Talgo 230) / NAT & RATP Dev Mobility Cairo (Capital Train)
Opened
2022
Operational/planned length
311 km
Lines
2
Stations / Stops
24
Weekday ridership
95,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (2)

  • Expresso Rápido Talgo ENR: Cairo (Ramses) – Banha – Tanta – Damanhur – Alexandria (Sidi Gaber / Misr) (In operation)
  • Capital Train (Cairo LRT 120 km/h): Adly Mansour – El Obour – Badr – 10th of Ramadan / Cidade das Artes e Cultura (Nova Capital) (In operation)

Stations / Stops (2)

  • Adly Mansour Central Hub (Metrô L3 + Capital Train LRT + Superjet) · Capital Train Cairo LRT
  • Arts and Culture City Station (Nova Capital Administrativa) · Capital Train Cairo LRT

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.