In operation Conventional rail 100% verified sheet
Luanda Railway (CFL — Bungo – Viana – Catete / New Airport Suburban & Malanje Express)
Luanda / Viana / Catete / Ndalatando / Malanje · LUA (Região Metropolitana de Luanda, Cuanza Norte e Malanje) — Angola
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Caminho de Ferro de Luanda, E.P. (CFL)
- Opened
- 1888
- Operational/planned length
- 479 km
- Lines
- 3
- Stations / Stops
- 36
- Weekday ridership
- 28,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- CFL (Bungo / Luanda – Viana – Baia – Novo Aeroporto / Catete – Zenza do Itombe – Ndalatando – Malanje) (In operation)
Stations / Stops (2)
- Estação Central do Bungo (Luanda) · CFL Suburbano e Longo Curso
- Estação de Malanje (CFL) · CFL Expresso Luanda – Malanje
Editorial coverage
No specific articles linked yet.