In operation Conventional rail 100% verified sheet

Beauport Sugar Cane Railway — Le Pays de la Canne (Port-Louis – Poyen – Anse-Bertrand Heritage Train, Guadeloupe)

Port-Louis (Usina de Beauport) / Poyen / Anse-Bertrand (Grande-Terre) · PLU (Norte da Grande-Terre (Port-Louis e Anse-Bertrand, Guadalupe)) — Guadalupe

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Beauport Le Pays de la Canne (Communauté d'Agglomération du Nord Grande-Terre)
Opened
1865
Operational/planned length
12 km
Lines
1
Stations / Stops
4
Weekday ridership
450 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Linha Turística e Canavieira de Beauport: Gare de Beauport (Port-Louis) – Poyen – Lubeth – Anse-Bertrand (Grande-Terre, Guadalupe) (In operation)

Stations / Stops (2)

  • Gare de Beauport — Le Pays de la Canne (Port-Louis, Guadalupe) · Linha Turística e Canavieira Port-Louis – Poyen – Anse-Bertrand
  • Halte de Poyen / Anse-Bertrand (Norte da Grande-Terre, Guadalupe) · Linha Turística e Canavieira Port-Louis – Poyen – Anse-Bertrand

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.