In operation Light rail (VLT) 100% verified sheet

Andorra Guided Mountain Transit & Andorra-L'Hospitalet Rail Gateway (Engolasters Hydro Electric Railway & Funicamp Encamp, Andorra)

Andorra la Vella / Encamp · Encamp / Escaldes-Engordany / Pas de la Casa (Principado de Andorra (Pireneus Orientais)) — Andorra

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
FEDA (Forces Elèctriques d'Andorra — Camí Hidroelèctric d'Engolasters) & Grandvalira / SNCF
Opened
1930
Operational/planned length
7.8 km
Lines
2
Stations / Stops
3
Weekday ridership
3,400 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Ferrovia Hidrelétrica e Funicular d'Engolasters (FEDA Encamp) e Eixo Ferroviário Pirenaico Andorra-L'Hospitalet (Andorra) (In operation)

Stations / Stops (1)

  • Estação Ferroviária e Hidrelétrica d'Engolasters / Funicamp d'Encamp (MW Museu de l'Electricitat FEDA, Andorra) · Ferrovia Hidrelétrica e Funicular d'Engolasters

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.