In operation Freight rail 100% verified sheet
COMILOG Mining Railway Branch (Mbinda – Mossendjo – Mont-Belo) & CFCO Freight Corridor to Port of Pointe-Noire (Republic of the Congo)
Pointe-Noire / Dolisie / Mossendjo · Niari (Mbinda / Mossendjo / Mont-Belo) / Pointe-Noire (Corredor Mineral e Florestal Niari – Porto de Pointe-Noire) — República do Congo
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- CFCO Freight & Port Autonome de Pointe-Noire (PAPN / Congo Terminal)
- Opened
- 1962
- Operational/planned length
- 285 km
- Lines
- 1
- Stations / Stops
- 1
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Ramal Mineraleiro COMILOG (Mbinda – Mossendjo – Mont-Belo) e Terminal Portuário de Pointe-Noire (República do Congo) (In operation)
Stations / Stops (1)
- Estação de Entroncamento de Mont-Belo / Dolisie e Ramal de Mbinda (CFCO, República do Congo) · Ramal Mineraleiro COMILOG e Terminal Portuário de Pointe-Noire
Editorial coverage
No specific articles linked yet.