In operation Freight rail 100% verified sheet

Syrian Phosphate & Port Freight Corridor (CFS — Khneifis / Palmyra Mines – Homs – Tartus & Latakia Ports – Adra)

Tartus / Latakia / Homs / Khneifis / Palmira (Tadmur) / Adra (Damasco) / Aleppo · HOM (Corredor Industrial e Portuário Sírio (Bacia de Fosfato de Palmira – Homs – Tartus)) — Síria

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Chemins de Fer Syriens (CFS Freight)
Opened
1980
Operational/planned length
540 km
Lines
2
Stations / Stops
15
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Corredor de Carga e Fosfatos CFS (Palmira / Khneifis – Homs – Porto de Tartus – Porto de Latakia e Homs – Adra) (In operation)

Stations / Stops (1)

  • Estação e Terminal Portuário de Tartus (CFS) · Corredor Costeiro Tartus – Latakia e Linha de Fosfatos Khneifis – Homs – Tartus

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.