In operation Freight rail 100% verified sheet

Caucasus Freight Rail Corridor (Tbilisi–Poti/Batumi & BTK) & Kryvyi Rih–Odesa Ore/Grain Corridor

Tbilisi / Poti / Batumi / Kryvyi Rih / Odessa · Kartli / Imereti / Samegrelo / Adjara (Corredor Transcaspiano Middle Corridor e Mar Negro) — Geórgia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Georgian Railways Cargo / Ukrzaliznytsia Cargo
Opened
1872
Operational/planned length
2,850 km
Lines
4
Stations / Stops
92
Weekday ridership
data being verified
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Corredor Transcaspiano do Cáucaso (Gardabani – Tbilisi – Khashuri – Zestafoni – Samtredia – Portos de Poti e Batumi) (In operation)

Stations / Stops (1)

  • Terminal Ferro-Portuário de Poti e Batumi (Mar Negro — Geórgia / Middle Corridor) · Corredor Transcaspiano de Carga Baku – Tbilisi – Poti / Batumi

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.