In operation Freight rail 100% verified sheet
Guinea Bauxite Heavy-Haul Railways (CBG Kamsar – Sangarédi, SMB-Winning Dapilon – Santou & Rusal Conakry – Kindia – Fria)
Kamsar / Boké / Sangarédi / Dapilon / Santou / Conacri / Kindia / Fria · BOK (Província Mineradora de Boké (Bacia de Bauxita da Baixa Guiné)) — Guiné
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- CBG (Compagnie des Bauxites de Guinée) / GAC / SMB-Winning Railway / Rusal
- Opened
- 1973
- Operational/planned length
- 1,150 km
- Lines
- 4
- Stations / Stops
- 26
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Corredores de Bauxita da Guiné (CBG Kamsar – Boké – Sangarédi, SMB Dapilon – Santou e Rusal Conacri – Kindia – Fria) (In operation)
Stations / Stops (2)
- Porto e Terminal Ferroviário de Kamsar (CBG / GAC — Boké, Guiné) · Ferrovia de Bauxita Kamsar – Boké – Sangarédi
- Complexo Minerador e Terminal Ferroviário de Sangarédi (CBG / GAC) · Ferrovia de Bauxita Kamsar – Boké – Sangarédi
Editorial coverage
No specific articles linked yet.