In operation Water transport (ferries & boats) 100% verified sheet

Wellington Harbour Electric Ferries (East by West / Metlink Ikaroa), Foveaux Strait Ferry (Bluff–Stewart Island / Rakiura) & Bay of Islands Ferries (New Zealand)

Wellington / Lower Hutt (Days Bay) / Bluff (Invercargill) / Oban (Stewart Island / Rakiura) / Opua e Russell (Northland) · Wellington / Southland / Northland () — Nova Zelândia

Wellington Harbour Electric Ferries (East by West / Metlink Ikaroa), Foveaux Strait Ferry (Bluff–Stewart Island / Rakiura) & Bay of Islands Ferries (New Zealand)
Photo: East by West Ferries / Wikimedia Commons · License: CC BY-SA 4.0

In New Zealand's capital, East by West Ferries (integrated into the Metlink public transit network with Snapper card ticketing) operates crossings of Wellington Harbour (Te Whanganui-a-Tara) between Queens Wharf, Matiu / Somes Island scientific reserve, Seatoun, and Days Bay (Eastbourne / Lower Hutt), led by EV Ikaroa — the Southern Hemisphere's first all-electric carbon-fiber high-speed passenger ferry. At the southern tip of the South Island, Stewart Island Ferry Services (RealNZ) ocean-going catamarans cross the 36 km of Foveaux Strait in 1 hour between Bluff and Oban (Halfmoon Bay) on Stewart Island / Rakiura (New Zealand's third-largest island), while in Northland vehicular and passenger ferries connect Opua–Okiato and Paihia–Russell in the Bay of Islands.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
East by West Ferries (rede pública Metlink Wellington), RealNZ (Stewart Island Ferry Services) e Bay of Islands Vehicular Ferry / Fullers GreatSights
Opened
1989 (East by West Ferries em Wellington) / 2022 (Inauguração do catamarã 100% elétrico Ikaroa em Wellington)
Operational/planned length
165 km
Lines
2
Stations / Stops
5
Weekday ridership
2,900 (2026)
Verified investment
NZD 65 milhões no programa de ferries elétricos de Wellington (EV Ikaroa e carregador de alta potência em Queens Wharf) e modernização dos terminais de Bluff e Oban
Upcoming deliveries & expansion
Construction of a second all-electric catamaran for the Metlink Wellington Harbour fleet and rollout of New Zealand's national Motu Move ticketing system.

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (2)

  • (In operation)
  • (In operation)

Stations / Stops (5)

  • Queens Wharf Ferry Terminal (Base do Ferry 100% Elétrico Ikaroa — Wellington CBD, NZ)
  • Days Bay Wharf (Eastbourne) & Matiu / Somes Island Wharf (Baía de Wellington, NZ)
  • Seatoun Wharf (Península Miramar — Metlink East by West Ferry, Wellington, NZ)
  • Bluff Ferry Terminal (Terminal Continental do Estreito de Foveaux — Southland, NZ)
  • Oban Halfmoon Bay Ferry Terminal (Ilha Stewart / Rakiura, NZ)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.