In operation Freight rail 100% verified sheet

Longoni Port Crane Tracks, Koungou Quarry Railway & Soulou Heritage Sugar Mill Rails (Mayotte)

Longoni / Koungou / Mamoudzou · Koungou / Tsingoni / Mamoudzou (Grande-Terre (Arquipélago de Mayotte)) — Mayotte

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Mayotte Channel Gateway (Porto de Longoni) & Écomusée de la Canne de Soulou
Opened
1860
Operational/planned length
4.8 km
Lines
1
Stations / Stops
2
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Vias Férreas do Porto de Longoni, Pedreira de Koungou e Écomusée Açucareiro de Soulou (Mayotte) (In operation)

Stations / Stops (2)

  • Terminal Portuário de Longoni e Pedreira Costeira de Koungou (Mayotte) · Vias Férreas do Porto de Longoni, Pedreira de Koungou e Écomusée Açucareiro de Soulou
  • Complexo Açucareiro Patrimonial e Trilhos Decauville de Soulou / Dzoumogné (Mayotte) · Vias Férreas do Porto de Longoni, Pedreira de Koungou e Écomusée Açucareiro de Soulou

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.