In operation Freight rail 100% verified sheet

Pepel – Marampa – Tonkolili Heavy-Haul Iron Ore Railway (Leone Rock Metal Group, Sierra Leone)

Pepel / Lunsar / Ferengbeya · Port Loko (Pepel / Marampa) / Tonkolili (Corredor Mineral Norte de Serra Leoa) — Serra Leoa

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Leone Rock Metal Group (Kingho Railway and Port Company) & Marampa Mines
Opened
1933
Operational/planned length
192 km
Lines
1
Stations / Stops
2
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Corredor Heavy-Haul de Minério de Ferro Porto de Pepel – Lunsar/Marampa – Ferengbeya/Tonkolili (Serra Leoa) (In operation)

Stations / Stops (2)

  • Terminal Ferroviário e Portuário de Minério de Ferro de Pepel (Porto de Pepel, Serra Leoa) · Corredor Heavy-Haul de Minério de Ferro Porto de Pepel – Lunsar/Marampa – Ferengbeya/Tonkolili
  • Complexo Ferroviário das Minas de Ferro de Tonkolili (Ferengbeya) e Marampa/Lunsar (Serra Leoa) · Corredor Heavy-Haul de Minério de Ferro Porto de Pepel – Lunsar/Marampa – Ferengbeya/Tonkolili

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.