In operation Conventional rail 100% verified sheet

Bolivian Eastern Railway Network — Santa Cruz de la Sierra–Puerto Quijarro (Corumbá) & Yacuiba

Santa Cruz de la Sierra / San José de Chiquitos / Puerto Quijarro / Yacuiba · Santa Cruz / Chuquisaca / Tarija (Corredor Bioceânico Leste Boliviano – Fronteiras Brasil e Argentina) — Bolívia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Ferroviaria Oriental S.A. (FO)
Opened
1955
Operational/planned length
1,244 km
Lines
2
Stations / Stops
38
Weekday ridership
4,500 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Linha Leste Chiquitana (Santa Cruz Bimodal – Pailón – San José de Chiquitos – Roboré – Carmen Rivero Tórrez – Puerto Quijarro / Fronteira Corumbá) (In operation)

Stations / Stops (2)

  • Terminal Bimodal de Santa Cruz de la Sierra (Coração da Ferroviaria Oriental) · Linhas Leste (Puerto Quijarro/Corumbá) e Sul (Yacuiba) da Ferroviaria Oriental
  • Estação de Puerto Quijarro (Fronteira Brasil–Bolívia com Corumbá e Hidrovia Paraguai–Paraná) · Linha Leste Santa Cruz – San José de Chiquitos – Roboré – Puerto Quijarro

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.