In operation Freight rail 100% verified sheet
East Point Copra Plantation Heritage Railway & Deep Water Pier Port Rail Tracks on Diego Garcia Atoll (British Indian Ocean Territory)
East Point / Downtown / Deep Water Pier (Diego Garcia) · Diego Garcia Atoll (Chagos) (Arquipélago de Chagos (Oceano Índico Central)) — Território Britânico do Oceano Índico
⚠️ Schematic/approximate alignment (planned or under construction)
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- BIOT Administration (East Point Heritage Site) / Navy Support Facility Diego Garcia Port Ops
- Opened
- 1,885
- Operational/planned length
- 4.6 km
- Lines
- 1
- Stations / Stops
- 2
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Ferrovia de Copra de East Point Plantation – Deep Water Pier (Atol de Diego Garcia, BIOT) (In operation)
Stations / Stops (2)
- Estação Patrimonial da Plantação de East Point (Atol de Diego Garcia, BIOT) · Ferrovia de Copra de East Point Plantation – Deep Water Pier (Atol de Diego Garcia, BIOT)
- Terminal Portuário de Deep Water Pier (Lagoa de Diego Garcia, BIOT) · Ferrovia de Copra de East Point Plantation – Deep Water Pier (Atol de Diego Garcia, BIOT)
Editorial coverage
No specific articles linked yet.