In operation Conventional rail 100% verified sheet

TAZARA Binational Railway (Dar es Salaam–Mbeya–Zambia) & TRC Central Line (Kigoma/Mwanza)

Dar es Salaam / Mbeya / Tabora / Kigoma · Dar es Salaam / Morogoro / Iringa / Mbeya / Tabora / Kigoma (Corredor Uhuru TAZARA e Grandes Lagos Africanos) — Tanzânia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Tanzania-Zambia Railway Authority (TAZARA) / Tanzania Railways Corporation (TRC)
Opened
1975
Operational/planned length
3,660 km
Lines
3
Stations / Stops
128
Weekday ridership
14,000 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Corredor TAZARA Uhuru Railway (Dar es Salaam – Kidatu – Makambako – Mbeya – Tunduma) (In operation)

Stations / Stops (1)

  • Estação TAZARA Dar es Salaam (Terminal Binacional Tanzânia–Zâmbia) · Ferrovia TAZARA (Dar es Salaam – Mbeya – New Kapiri Mposhi) e Trem Suburbano de Dar es Salaam

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.