In operation Freight rail 100% verified sheet

Suriname Bauxite Rail Corridors (Bakhuis – Apoera Heavy-Haul Railway on the Courantyne River & Paranam / Lelydorp Complex)

Apoera (Rio Corantijn) / Montanhas Bakhuis / Paranam / Moengo · SIP (Oeste de Sipaliwini (Apoera–Bakhuis) e Bacia do Rio Suriname (Paranam)) — Suriname

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Grassalco / Bakhuis Bauxite Project / Suralco Industrial Rail
Opened
1980
Operational/planned length
72 km
Lines
2
Stations / Stops
5
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Ferrovia Pesada de Bauxita Apoera (Rio Corantijn) – Montanhas Bakhuis e Ramal Industrial de Paranam (Suriname) (In operation)

Stations / Stops (1)

  • Terminal Ferroviário e Porto Fluvial de Apoera (Ferrovia Bakhuis–Apoera no Rio Corantijn, Suriname) · Ferrovia Pesada de Bauxita Montanhas Bakhuis – Apoera

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.