In operation Freight rail 100% verified sheet
Suriname Bauxite Rail Corridors (Bakhuis – Apoera Heavy-Haul Railway on the Courantyne River & Paranam / Lelydorp Complex)
Apoera (Rio Corantijn) / Montanhas Bakhuis / Paranam / Moengo · SIP (Oeste de Sipaliwini (Apoera–Bakhuis) e Bacia do Rio Suriname (Paranam)) — Suriname
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Grassalco / Bakhuis Bauxite Project / Suralco Industrial Rail
- Opened
- 1980
- Operational/planned length
- 72 km
- Lines
- 2
- Stations / Stops
- 5
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Ferrovia Pesada de Bauxita Apoera (Rio Corantijn) – Montanhas Bakhuis e Ramal Industrial de Paranam (Suriname) (In operation)
Stations / Stops (1)
- Terminal Ferroviário e Porto Fluvial de Apoera (Ferrovia Bakhuis–Apoera no Rio Corantijn, Suriname) · Ferrovia Pesada de Bauxita Montanhas Bakhuis – Apoera
Editorial coverage
No specific articles linked yet.