In operation Freight rail 100% verified sheet
Eurasian Middle Corridor Freight Rail (Baku–Tbilisi–Kars – Marmaray Tunnel – Kapıkule) & Mersin/İskenderun Ports
Kars / Sivas / Ancara / Istambul / Edirne (Kapıkule) / Mersin / İskenderun · TR (Ponte Terrestre Euro-Asiática (Trácia – Bósforo – Anatólia – Cáucaso)) — Turquia
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- TCDD Taşımacılık Freight / Körfez Ulaştırma / Pasifik Eurasia
- Opened
- 2017
- Operational/planned length
- 4,850 km
- Lines
- 3
- Stations / Stops
- 32
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Corredor Euro-Asiático de Carga (Middle Corridor / BTK): Fronteira Geórgia (Kars) – Erzurum – Erzincan – Sivas – Kayseri – Ancara – Eskişehir – Túnel Marmaray – Edirne (Kapıkule) + Ramal Porto de Mersin (In operation)
Stations / Stops (1)
- Terminal Logístico Internacional de Kars (Porta do Corredor Baku–Tbilisi–Kars) · Ferrovia Baku–Tbilisi–Kars (BTK)
Editorial coverage
No specific articles linked yet.