In operation Freight rail 100% verified sheet

Tower Hill Sugar Factory Industrial Rails Orange Walk & Port of Big Creek / Belize City Logistics Tracks (Belize)

Orange Walk Town / Big Creek · Orange Walk / Stann Creek (Polo Açucareiro do Norte de Belize e Porto de Big Creek) — Belize

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Belize Sugar Industries (BSI / ASR Tower Hill) & Port of Big Creek
Opened
1967
Operational/planned length
22 km
Lines
2
Stations / Stops
3
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Vias Férreas Industriais da Usina Açucareira de Tower Hill (Orange Walk – Rio New River) e Terminal Portuário de Big Creek (Belize) (In operation)

Stations / Stops (1)

  • Pátio Industrial Açucareiro de Tower Hill (BSI / ASR Orange Walk, Belize) · Vias Férreas Industriais da Usina Açucareira de Tower Hill

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.