In operation Freight rail 100% verified sheet
Port Victoria Quay Tracks (Mahé) & Outer Islands Guano Phosphate Railways on St. Pierre, Astove & Assumption (Seychelles)
Victoria · Mahé (Port Victoria) / Ilhas Exteriores (St. Pierre e Assumpção) (Ilha de Mahé e Arquipélago das Seicheles) — Seicheles
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Seychelles Ports Authority (Port Victoria) & Islands Development Company (IDC Seychelles)
- Opened
- 1906
- Operational/planned length
- 6.5 km
- Lines
- 1
- Stations / Stops
- 2
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Vias Férreas Portuárias de Port Victoria (Mahé) e Trilhos Mineradores de Guano/Fosfato das Seicheles (In operation)
Stations / Stops (2)
- Cais Comercial de Port Victoria e Antigo Píer Long Pier (Mahé, Seicheles) · Vias Férreas Portuárias de Port Victoria (Mahé) e Trilhos Mineradores de Guano/Fosfato das Seicheles
- Ferrovia Insular de Fosfato e Guano da Ilha de St. Pierre / Assumpção (Ilhas Exteriores, Seicheles) · Vias Férreas Portuárias de Port Victoria (Mahé) e Trilhos Mineradores de Guano/Fosfato das Seicheles
Editorial coverage
No specific articles linked yet.