In operation Conventional rail 100% verified sheet

KAI Commuter (KRL Jabodetabek & Yogyakarta–Solo) & Trans-Java Intercity Mainlines (Jakarta–Yogyakarta–Surabaya)

Jacarta / Bogor / Bandung / Semarang / Yogyakarta / Solo / Surabaya · ID (Ilha de Java (Jabodetabek, Java Central e Java Oriental)) — Indonésia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
PT Kereta Api Indonesia (KAI) / KAI Commuter
Opened
1867
Operational/planned length
4,960 km
Lines
8
Stations / Stops
420
Weekday ridership
1,350,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (2)

  • KRL Commuterline Jabodetabek (Jakarta Kota – Manggarai – Bogor & Tanah Abang – Bekasi / Tangerang) (In operation)
  • Troncos Norte e Sul da Ilha de Java (KAI): Jacarta (Gambir / Pasar Senen) – Cirebon – Semarang – Solo Balapan / Bandung – Yogyakarta – Surabaya (Pasar Turi / Gubeng) (In operation)

Stations / Stops (3)

  • Manggarai Central Station & Gambir Station (Hubs Ferroviários de Jacarta) · KRL Commuterline / Expressos Argo Trans-Java
  • Yogyakarta Tugu Station (Eixo Sul de Java + KRL Yogyakarta–Solo + Airport Rail Link YIA) · Tronco Sul de Java / KRL Yogya–Solo
  • Surabaya Pasar Turi & Surabaya Gubeng Stations (Terminais Orientais de Java) · Troncos Norte e Sul de Java KAI

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.