In operation Conventional rail 100% verified sheet
Kenya Standard Gauge Railway Madaraka Express (Mombasa–Nairobi–Suswa) & Nairobi Commuter Rail
Nairóbi / Mombasa / Naivasha · Mombasa / Taita-Taveta / Makueni / Nairóbi / Nakuru (Corredor Mombasa–Nairóbi–Vale do Rift) — Quênia
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Kenya Railways Corporation (KRC) / Afristar
- Opened
- 2017
- Operational/planned length
- 750 km
- Lines
- 6
- Stations / Stops
- 48
- Weekday ridership
- 38,000 (2025)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Madaraka Express SGR (Mombasa Terminus Miritini – Voi – Mtito Andei – Emali – Nairobi Terminus Syokimau – Suswa) (In operation)
Stations / Stops (2)
- Estação Nairobi Terminus (Syokimau — Hub do Madaraka Express e Nairobi Commuter Rail) · Madaraka Express SGR (Mombasa–Nairóbi–Suswa) e DMU para Nairobi Central
- Estação Mombasa Terminus (Miritini — Portal Oceânico do Madaraka Express) · Madaraka Express SGR (Mombasa–Nairóbi)
Editorial coverage
No specific articles linked yet.