In operation Conventional rail 100% verified sheet

Kenya Standard Gauge Railway Madaraka Express (Mombasa–Nairobi–Suswa) & Nairobi Commuter Rail

Nairóbi / Mombasa / Naivasha · Mombasa / Taita-Taveta / Makueni / Nairóbi / Nakuru (Corredor Mombasa–Nairóbi–Vale do Rift) — Quênia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Kenya Railways Corporation (KRC) / Afristar
Opened
2017
Operational/planned length
750 km
Lines
6
Stations / Stops
48
Weekday ridership
38,000 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Madaraka Express SGR (Mombasa Terminus Miritini – Voi – Mtito Andei – Emali – Nairobi Terminus Syokimau – Suswa) (In operation)

Stations / Stops (2)

  • Estação Nairobi Terminus (Syokimau — Hub do Madaraka Express e Nairobi Commuter Rail) · Madaraka Express SGR (Mombasa–Nairóbi–Suswa) e DMU para Nairobi Central
  • Estação Mombasa Terminus (Miritini — Portal Oceânico do Madaraka Express) · Madaraka Express SGR (Mombasa–Nairóbi)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.