In operation Conventional rail 100% verified sheet
KTZ Tulpar-Talgo Expresses (Astana–Almaty–Shymkent) & UTY Silk Road Network (Kamchik Tunnel / Fergana & Khiva)
Astana / Karaganda / Almaty / Shymkent / Tashkent / Andijan / Urgench / Khiva · KZ (Malhas Nacionais da Ásia Central (KTZ 16.600 km & UTY 4.735 km)) — Cazaquistão
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- KTZ (Kazakhstan Temir Zholy) & UTY (Oʻzbekiston Temir Yoʻllari)
- Opened
- 1904
- Operational/planned length
- 21,335 km
- Lines
- 8
- Stations / Stops
- 520
- Weekday ridership
- 140,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (2)
- Corredor Norte–Sul KTZ (Tulpar-Talgo): Petropavl – Kokshetau – Astana Nurly Zhol – Karaganda – Shu – Almaty – Shymkent – Tashkent (In operation)
- Malha da Rota da Seda UTY: Andijan / Vale de Fergana – Túnel de Kamchik (19,2 km) – Tashkent – Samarcanda – Bukhara – Urgench – Khiva (In operation)
Stations / Stops (2)
- Astana Nurly Zhol Grand Railway Station (Capital do Cazaquistão — Terminal KTZ Tulpar-Talgo) · KTZ Tulpar-Talgo
- Almaty-2 Central Station & Khiva Silk Road Station · KTZ / UTY
Editorial coverage
No specific articles linked yet.