In operation Metro / Subway 100% verified sheet
Almaty Metro (Line 1 Raiymbek Batyr – Bauyrzhan Momyshuly)
Almaty · KZ (Região Metropolitana de Almaty) — Cazaquistão
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- KGP Metropoliten (Almaty Metro)
- Opened
- 2011
- Operational/planned length
- 13.4 km
- Lines
- 1
- Stations / Stops
- 11
- Weekday ridership
- 110,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Metrô de Almaty Linha 1: Raiymbek Batyr – Zhibek Zholy – Almaly – Abay – Baikonur – Alatau – Bauyrzhan Momyshuly (In operation)
Stations / Stops (1)
- Zhibek Zholy & Abay Metro Stations (Coração Cultural de Almaty) · Metrô de Almaty Linha 1
Editorial coverage
No specific articles linked yet.