In operation Metro / Subway 100% verified sheet
Honolulu Skyline Automated Metro — HART (East Kapolei – Waipahu – Pearl Harbor – Aloha Stadium / Hālawa, Oahu Island, Hawaii)
Honolulu / Kapolei / Pearl Harbor (Oahu) · HI (Ilha de Oahu (Havaí Central — Pacífico Norte)) — Ilha de Oahu (Havaí)
First fully automated driverless (GoA4) heavy-rail metro system in the United States and the only oceanic metro in the Central Pacific, opened on June 30, 2023 on Oahu Island, Hawaii. Operates on an elevated standard-gauge (1435 mm) viaduct with 750 V DC third rail and 4-car Hitachi Rail Italy trains between Kualakaʻi (East Kapolei), Pouhala (Waipahu), Pearl Highlands, and Hālawa (Aloha Stadium / Joint Base Pearl Harbor-Hickam).
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Department of Transportation Services (DTS) / Honolulu Authority for Rapid Transportation (HART) / Hitachi Rail Honolulu
- Opened
- 2023
- Operational/planned length
- 17.4 km
- Lines
- 1
- Stations / Stops
- 9
- Weekday ridership
- 12,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Linha Skyline HART (Kualakaʻi / East Kapolei – Waipahu – Pearl Highlands – Hālawa / Aloha Stadium — Oahu) (In operation)
Stations / Stops (2)
- Estação Kualakaʻi / East Kapolei (Terminal Oeste do Metrô Automatizado Skyline de Honolulu — Oahu, Havaí) · Linha Skyline HART (Kualakaʻi / East Kapolei – Waipahu – Pearl Highlands – Hālawa / Aloha Stadium — Oahu)
- Estação Hālawa / Aloha Stadium – Pearl Harbor (Metrô Elevado Skyline GoA4 de Honolulu — Oahu, Havaí) · Linha Skyline HART (Kualakaʻi / East Kapolei – Waipahu – Pearl Highlands – Hālawa / Aloha Stadium — Oahu)
Editorial coverage
No specific articles linked yet.