In operation Metro / Subway 100% verified sheet

Brussels Metro (STIB/MIVB — Lines 1, 2, 5 & 6: Gare de l'Ouest – De Brouckère – Arts-Loi – Schuman – Roi Baudouin / Herrmann-Debroux)

Bruxelas · Região de Bruxelas-Capital (Região Metropolitana de Bruxelas) — Bélgica

⚠️ Schematic/approximate alignment (planned or under construction)

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
STIB / MIVB (Société des Transports Intercommunaux de Bruxelles)
Opened
1976
Operational/planned length
40.2 km
Lines
4
Stations / Stops
59
Weekday ridership
480,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Metrô de Bruxelas STIB/MIVB Linhas 1, 2, 5 e 6 (Roi Baudouin – Gare de l'Ouest – De Brouckère – Arts-Loi – Schuman – Herrmann-Debroux) (In operation)

Stations / Stops (1)

  • Arts-Loi / Kunst-Wet & De Brouckère (Metrô de Bruxelas STIB/MIVB Linhas 1, 2, 5 e 6) · Metrô de Bruxelas (STIB/MIVB)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.