In operation Metro / Subway 100% verified sheet

Tashkent Metro (Chilonzor, Oʻzbekiston, Yunusobod & Circle Lines)

Tashkent · UZ (Região Metropolitana de Tashkent) — Uzbequistão

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Toshkent Metropoliteni (UTY)
Opened
1977
Operational/planned length
70.8 km
Lines
4
Stations / Stops
50
Weekday ridership
680,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Metrô de Tashkent: Linhas Chilonzor, Oʻzbekiston, Yunusobod & Anel Elevado Yerusti Halqa Yoʻli (50 Estações) (In operation)

Stations / Stops (2)

  • Kosmonavtlar & Alisher Navoiy / Paxtakor Interchange (Estações Subterrâneas Palacianas de Tashkent) · Metrô de Tashkent Linhas Chilonzor & Oʻzbekiston
  • Yunus Rajabiy / Amir Temur Xiyoboni Interchange (Centro de Tashkent) · Metrô de Tashkent Linhas Chilonzor & Yunusobod

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.