In operation Light rail (VLT) 100% verified sheet

Metrotenerife — Tenerife Tramway Lines 1 & 2 (Santa Cruz de Tenerife – San Cristóbal de La Laguna – La Cuesta – Tíncer, Canary Islands, Spain)

Santa Cruz de Tenerife / San Cristóbal de La Laguna · Comunidad Autónoma de Canarias (Provincia de Santa Cruz de Tenerife) (Área Metropolitana de Santa Cruz de Tenerife – La Laguna (Ilha de Tenerife, Atlântico Macaronésio)) — Ilhas Canárias

⚠️ Schematic/approximate alignment (planned or under construction)

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Metropolitano de Tenerife S.A. (Metrotenerife — Cabildo Insular de Tenerife)
Opened
2,007
Operational/planned length
15.1 km
Lines
2
Stations / Stops
25
Weekday ridership
62,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer) (In operation)

Stations / Stops (2)

  • Estação Intercambiador de Santa Cruz de Tenerife (Terminal Linha 1 Metrotenerife, Ilhas Canárias) · Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer)
  • Estação La Trinidad — San Cristóbal de La Laguna (Centro Histórico Patrimônio Mundial UNESCO, Tenerife) · Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.