In operation Light rail (VLT) 100% verified sheet
Metrotenerife — Tenerife Tramway Lines 1 & 2 (Santa Cruz de Tenerife – San Cristóbal de La Laguna – La Cuesta – Tíncer, Canary Islands, Spain)
Santa Cruz de Tenerife / San Cristóbal de La Laguna · Comunidad Autónoma de Canarias (Provincia de Santa Cruz de Tenerife) (Área Metropolitana de Santa Cruz de Tenerife – La Laguna (Ilha de Tenerife, Atlântico Macaronésio)) — Ilhas Canárias
⚠️ Schematic/approximate alignment (planned or under construction)
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Metropolitano de Tenerife S.A. (Metrotenerife — Cabildo Insular de Tenerife)
- Opened
- 2,007
- Operational/planned length
- 15.1 km
- Lines
- 2
- Stations / Stops
- 25
- Weekday ridership
- 62,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer) (In operation)
Stations / Stops (2)
- Estação Intercambiador de Santa Cruz de Tenerife (Terminal Linha 1 Metrotenerife, Ilhas Canárias) · Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer)
- Estação La Trinidad — San Cristóbal de La Laguna (Centro Histórico Patrimônio Mundial UNESCO, Tenerife) · Metrotenerife Linha 1 (Intercambiador de Santa Cruz – Hospital Universitario – Campus Guajara – La Trinidad em La Laguna) & Linha 2 (La Cuesta – Tíncer)
Editorial coverage
No specific articles linked yet.