In operation Conventional rail 100% verified sheet

Myanma Railways National Trunk (Yangon–Naypyidaw–Mandalay & Historic Goteik Viaduct)

Yangon / Naypyidaw / Mandalay / Pyin Oo Lwin · Yangon / Bago / Naypyidaw / Mandalay / Shan (Eixo Central de Mianmar e Planalto Shan) — Mianmar

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Myanma Railways (MR)
Opened
1877
Operational/planned length
1,100 km
Lines
4
Stations / Stops
135
Weekday ridership
65,000 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Tronco Principal Yangon – Bago – Taungoo – Naypyidaw – Thazi – Mandalay – Pyin Oo Lwin – Viaduto de Goteik – Lashio (In operation)

Stations / Stops (2)

  • Estação Central de Mandalay e Naypyidaw (Hubs do Tronco Central Birmanês) · Tronco Principal Yangon – Naypyidaw – Mandalay
  • Viaduto Ferroviário de Goteik (Goteik Viaduct — Ponte Histórica de Aço de 1900 a 102 m de Altura) · Linha Montanhosa Mandalay – Pyin Oo Lwin – Goteik – Hsipaw – Lashio

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.