In operation Freight rail 100% verified sheet

Kigali Logistics Platform / Masaka Intermodal Rail-Road Dry Port (Central & Northern Corridor Rail Gateway, Rwanda)

Kigali · Kigali (Distrito de Kicukiro / Masaka) (Grande Kigali) — Ruanda

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
DP World Kigali Logistics Platform (Masaka ICD) & Rwanda Transport Development Agency (RTDA)
Opened
2019
Operational/planned length
12 km
Lines
1
Stations / Stops
1
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Pátio e Terminal Intermodal Ferroviário-Rodoviário de Masaka / Kigali Logistics Platform (Ruanda) (In operation)

Stations / Stops (1)

  • Terminal Intermodal e Pátio de Pórticos Sobre Trilhos (RTG/RMG) de Masaka / Kigali Logistics Platform (Kigali, Ruanda) · Pátio e Terminal Intermodal Ferroviário-Rodoviário de Masaka / Kigali Logistics Platform

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.