In operation Freight rail 100% verified sheet

Phuentsholing / Pasakha & Gelephu Mindfulness City Dry Ports and Cross-Border Rail Gateways (Bhutan)

Phuentsholing / Gelephu · Distrito de Chukha (Phuentsholing / Pasakha) / Distrito de Sarpang (Gelephu) (Fronteira Sul do Himalaia Butanês (Duars)) — Butão

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Department of Trade of Bhutan (Phuentsholing / Pasakha ICD) & Gelephu Mindfulness City Authority
Opened
2021
Operational/planned length
14 km
Lines
1
Stations / Stops
2
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Portos Secos e Terminais Intermodais Fronteiriços de Phuentsholing / Pasakha e Gelephu (Butão) (In operation)

Stations / Stops (2)

  • Porto Seco e Terminal Intermodal Ferroviário-Rodoviário de Phuentsholing / Pasakha (Distrito de Chukha, Butão) · Portos Secos e Terminais Intermodais Fronteiriços de Phuentsholing / Pasakha e Gelephu
  • Terminal Ferroviário-Logístico Internacional de Gelephu Mindfulness City (Distrito de Sarpang, Butão) · Portos Secos e Terminais Intermodais Fronteiriços de Phuentsholing / Pasakha e Gelephu

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.