In operation Conventional rail 100% verified sheet
Tajik Railways (ROT — Dushanbe – Vahdat – Bokhtar – Kulob Railway, Pakhtaabad Axis & Northern Khujand Line)
Dushanbe / Vahdat / Yavan / Bokhtar / Kulob / Pakhtaabad / Khujand · DYU (Vale de Gissar (Dushanbe), Khatlon e Vale de Fergana (Khujand)) — Tadjiquistão
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- KVD Rohi Ohani Tojikiston (Ferrovias do Tadjiquistão)
- Opened
- 1929
- Operational/planned length
- 680 km
- Lines
- 3
- Stations / Stops
- 33
- Weekday ridership
- 9,500 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Linha Central e Sul ROT (Pakhtaabad – Tursunzoda – Dushanbe-1 – Vahdat – Yavan – Bokhtar – Kulob) e Ramal Norte Khujand (In operation)
Stations / Stops (2)
- Estação Central Dushanbe-1 (Душанбе I — Rohi Ohani Tojikiston) · Linha Pakhtaabad – Dushanbe-1 – Vahdat – Yavan – Bokhtar – Kulob
- Estação Bokhtar / Qurghonteppa (Entroncamento Sul de Khatlon — ROT) · Linha de Montanha Dushanbe – Vahdat – Yavan – Bokhtar – Kulob
Editorial coverage
No specific articles linked yet.