In operation Light rail (VLT) 100% verified sheet
Ayacucho Tramway (Medellín Line T-A Translohr LRT) & Barranco Heritage Tram (Lima)
Medellín / Lima (Barranco) · CO (Vale de Aburrá (Medellín) & Distrito de Barranco (Lima)) — Colômbia
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Metro de Medellín / Municipalidad de Barranco
- Opened
- 2015
- Operational/planned length
- 5.3 km
- Lines
- 2
- Stations / Stops
- 11
- Weekday ridership
- 92,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Tranvía de Ayacucho Linha T-A (Medellín: San Antonio – Miraflores – Alejandro Echavarría – Oriente) (In operation)
Stations / Stops (1)
- Estación Oriente (Medellín — Terminal do VLT Tranvía de Ayacucho + Metrocable Linhas H e M) · Tranvía de Ayacucho T-A
Editorial coverage
No specific articles linked yet.