In operation Conventional rail 100% verified sheet

Bogotá Savannah Train (Bogotá – Usaquén – Chía – Cajicá – Zipaquirá) & Bogotá–Belencito Corridor

Bogotá / Chía / Cajicá / Zipaquirá / Tunja / Sogamoso (Belencito) · CO (Savana de Bogotá e Altiplano Cundiboyacense (2.600 m de altitude)) — Colômbia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Turistren / ANI (Agencia Nacional de Infraestructura) / Consórcio Ferroviário Bogotá–Belencito
Opened
1889
Operational/planned length
257 km
Lines
2
Stations / Stops
14
Weekday ridership
8,500 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Tren de la Sabana & Corredor Ferreo Central: Bogotá (Estación de la Sabana / Usaquén) – Chía – Cajicá – Zipaquirá – Tunja – Sogamoso (Belencito) (In operation)

Stations / Stops (1)

  • Estación de la Sabana (Bogotá, 1917) & Estación de Zipaquirá (Catedral de Sal) · Tren de la Sabana

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.