In operation Metro / Subway 100% verified sheet
San Juan Tren Urbano (ATI / DTOP — Automated Heavy Rail Metro Bayamón – Río Piedras – Hato Rey – Sagrado Corazón, Puerto Rico)
San Juan / Bayamón / Guaynabo / Río Piedras / Hato Rey / Santurce · SJU (Área Metropolitana de San Juan–Bayamón–Carolina (Porto Rico)) — Porto Rico
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Autoridad de Transporte Integrado (ATI) / ACI-Herzog
- Opened
- 2004
- Operational/planned length
- 17.2 km
- Lines
- 1
- Stations / Stops
- 16
- Weekday ridership
- 24,000 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Linha 1 do Tren Urbano de San Juan: Bayamón – Deportivo – Martínez Nadal – Centro Médico – Río Piedras (Subterrânea) – Hato Rey – Sagrado Corazón (In operation)
Stations / Stops (3)
- Estación Sagrado Corazón (Terminal Norte do Tren Urbano em Santurce, San Juan — Porto Rico) · Linha 1 do Tren Urbano (Bayamón – Sagrado Corazón)
- Estación Subterrânea Río Piedras / Universidad (Tren Urbano de San Juan, Porto Rico) · Linha 1 do Tren Urbano (Trecho Subterrâneo sob a Ponce de León)
- Estación Bayamón (Terminal Oeste do Tren Urbano, Porto Rico) · Linha 1 do Tren Urbano (Bayamón – Sagrado Corazón)
Editorial coverage
No specific articles linked yet.