In operation Metro / Subway 100% verified sheet

San Juan Tren Urbano (ATI / DTOP — Automated Heavy Rail Metro Bayamón – Río Piedras – Hato Rey – Sagrado Corazón, Puerto Rico)

San Juan / Bayamón / Guaynabo / Río Piedras / Hato Rey / Santurce · SJU (Área Metropolitana de San Juan–Bayamón–Carolina (Porto Rico)) — Porto Rico

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Autoridad de Transporte Integrado (ATI) / ACI-Herzog
Opened
2004
Operational/planned length
17.2 km
Lines
1
Stations / Stops
16
Weekday ridership
24,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Linha 1 do Tren Urbano de San Juan: Bayamón – Deportivo – Martínez Nadal – Centro Médico – Río Piedras (Subterrânea) – Hato Rey – Sagrado Corazón (In operation)

Stations / Stops (3)

  • Estación Sagrado Corazón (Terminal Norte do Tren Urbano em Santurce, San Juan — Porto Rico) · Linha 1 do Tren Urbano (Bayamón – Sagrado Corazón)
  • Estación Subterrânea Río Piedras / Universidad (Tren Urbano de San Juan, Porto Rico) · Linha 1 do Tren Urbano (Trecho Subterrâneo sob a Ponce de León)
  • Estación Bayamón (Terminal Oeste do Tren Urbano, Porto Rico) · Linha 1 do Tren Urbano (Bayamón – Sagrado Corazón)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.