In operation Freight rail 100% verified sheet
Mata-Utu Wharf Port Rail Tracks (Uvéa / Wallis Island) & Leava Pier Tracks in Sigave (Futuna Island, Wallis and Futuna)
Mata-Utu / Halalo / Leava · Uvéa / Sigave (Coletividade Ultramarina Francesa de Wallis e Futuna) — Wallis e Futuna
⚠️ Schematic/approximate alignment (planned or under construction)
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Service des Travaux Publics et des Infrastructures Portuaires de Wallis-et-Futuna
- Opened
- 1,942
- Operational/planned length
- 2.4 km
- Lines
- 1
- Stations / Stops
- 2
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Vias Portuárias do Cais de Mata-Utu – Halalo (Ilha de Wallis / Uvéa) (In operation)
Stations / Stops (2)
- Terminal Portuário de Mata-Utu / Halalo (Ilha de Wallis / Uvéa) · Vias Portuárias do Cais de Mata-Utu – Halalo (Ilha de Wallis / Uvéa)
- Terminal Portuário do Cais de Leava (Reino de Sigave, Ilha de Futuna) · Vias Portuárias do Cais de Mata-Utu – Halalo (Ilha de Wallis / Uvéa)
Editorial coverage
No specific articles linked yet.