In operation Light rail (VLT) 100% verified sheet

Romanian Light Rail & Tramway Networks (Bucharest STB Light Metro Line 41 & Trams, Timișoara, Iași, Cluj-Napoca, Oradea & Arad)

Bucareste / Timișoara / Iași / Cluj-Napoca / Oradea / Arad / Craiova / Galați · Bucareste / Timiș / Iași / Cluj / Bihor / Arad (Principais Regiões Metropolitanas da Romênia) — Romênia

⚠️ Schematic/approximate alignment (planned or under construction)

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
STB București / STPT Timișoara / CTP Iași / CTP Cluj-Napoca / OTL Oradea
Opened
1869
Operational/planned length
465 km
Lines
72
Stations / Stops
980
Weekday ridership
920,000 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Metrô Leve Linha 41 e Bondes de Bucareste (STB), Timișoara, Iași, Cluj-Napoca e Oradea (In operation)

Stations / Stops (1)

  • Ghencea / Piața Presei Libere (Metrô Leve Linha 41 STB Bucareste) & Timișoara Catedrala · VLTs e Bondes da Romênia (Linha 41 & Redes Urbanas)

Editorial coverage

No specific articles linked yet.

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.