In operation Conventional rail 100% verified sheet
Yangon Circular Railway — Metropolitan Suburban Loop Line (39 Stations)
Yangon · Região de Yangon (Região Metropolitana de Yangon) — Mianmar
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Myanma Railways (MR)
- Opened
- 1959
- Operational/planned length
- 45.9 km
- Lines
- 1
- Stations / Stops
- 39
- Weekday ridership
- 90,000 (2025)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Anel Suburbano de Yangon (Yangon Central – Kyeemyindaing – Insein – Mingaladon – Mahlwagone – Yangon Central) (In operation)
Stations / Stops (1)
- Estação Central de Yangon (Yangon Central Railway Station — Arquitetura Tradicional Birmanesa Pyatthat) · Ferrovia Circular de Yangon e Tronco Yangon–Naypyidaw–Mandalay
Editorial coverage
No specific articles linked yet.