In operation Freight rail 100% verified sheet
Uruguay Central Railway (Ferrocarril Central) — Port of Montevideo–Paso de los Toros Freight Corridor
Montevidéu / Canelones / Florida / Durazno / Paso de los Toros · Montevidéu / Canelones / Florida / Durazno / Tacuarembó (Eixo Central Uruguaio (Rio da Prata – Rio Negro)) — Uruguai
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Portren / DBCC Transport (Deutsche Bahn & Cointer) / MTOP
- Opened
- 2024
- Operational/planned length
- 273 km
- Lines
- 1
- Stations / Stops
- 16
- Weekday ridership
- data being verified
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Ferrocarril Central 22,5 t/eixo (Terminal Portuário de Montevidéu – Las Piedras – Canelones – Florida – Sarandí Grande – Durazno – Paso de los Toros) (In operation)
Stations / Stops (2)
- Terminal Ferro-Portuário de Montevidéu (Ferrocarril Central do Uruguai) · Ferrocarril Central Porto de Montevidéu – Paso de los Toros
- Terminal Industrial de Paso de los Toros e Durazno (Centro do Uruguai — Rio Negro) · Ferrocarril Central Porto de Montevidéu – Paso de los Toros