In operation Freight rail 100% verified sheet

Uruguay Central Railway (Ferrocarril Central) — Port of Montevideo–Paso de los Toros Freight Corridor

Montevidéu / Canelones / Florida / Durazno / Paso de los Toros · Montevidéu / Canelones / Florida / Durazno / Tacuarembó (Eixo Central Uruguaio (Rio da Prata – Rio Negro)) — Uruguai

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Portren / DBCC Transport (Deutsche Bahn & Cointer) / MTOP
Opened
2024
Operational/planned length
273 km
Lines
1
Stations / Stops
16
Weekday ridership
data being verified
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Ferrocarril Central 22,5 t/eixo (Terminal Portuário de Montevidéu – Las Piedras – Canelones – Florida – Sarandí Grande – Durazno – Paso de los Toros) (In operation)

Stations / Stops (2)

  • Terminal Ferro-Portuário de Montevidéu (Ferrocarril Central do Uruguai) · Ferrocarril Central Porto de Montevidéu – Paso de los Toros
  • Terminal Industrial de Paso de los Toros e Durazno (Centro do Uruguai — Rio Negro) · Ferrocarril Central Porto de Montevidéu – Paso de los Toros

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.