In operation Freight rail 100% verified sheet

North African Iron Ore & Phosphate Corridors (Ouenza/Djebel Onk–Annaba Port in Algeria & Gafsa–Sfax Port in Tunisia) + Apapa Port Rail (Nigeria)

Tébessa (Djebel Onk / Ouenza) / Souk Ahras / Porto de Annaba / Gafsa (Métlaoui) / Porto de Sfax / Porto de Apapa (Lagos) · DZ (Bacias Minerais do Leste Argelino, Sul Tunisiano e Corredor Portuário de Lagos) — Argélia

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
SNTF Fret / SNCFT Phosphates / NRC Freight
Opened
1900
Operational/planned length
1,150 km
Lines
3
Stations / Stops
24
Weekday ridership
0 (2026)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Corredor Mineral Leste Argelino (Minas de Fosfato de Djebel Onk e Minério de Ferro de Ouenza – Souk Ahras – Porto de Annaba) & Corredor de Fosfato de Gafsa/Métlaoui – Porto de Sfax (Tunísia) (In operation)

Stations / Stops (1)

  • Terminal Mineral do Porto de Annaba (Argélia) & Porto de Fosfato de Sfax (Tunísia) · SNTF Fret / SNCFT Phosphates

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.