In operation Freight rail 100% verified sheet
North African Iron Ore & Phosphate Corridors (Ouenza/Djebel Onk–Annaba Port in Algeria & Gafsa–Sfax Port in Tunisia) + Apapa Port Rail (Nigeria)
Tébessa (Djebel Onk / Ouenza) / Souk Ahras / Porto de Annaba / Gafsa (Métlaoui) / Porto de Sfax / Porto de Apapa (Lagos) · DZ (Bacias Minerais do Leste Argelino, Sul Tunisiano e Corredor Portuário de Lagos) — Argélia
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- SNTF Fret / SNCFT Phosphates / NRC Freight
- Opened
- 1900
- Operational/planned length
- 1,150 km
- Lines
- 3
- Stations / Stops
- 24
- Weekday ridership
- 0 (2026)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- data being verified
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Corredor Mineral Leste Argelino (Minas de Fosfato de Djebel Onk e Minério de Ferro de Ouenza – Souk Ahras – Porto de Annaba) & Corredor de Fosfato de Gafsa/Métlaoui – Porto de Sfax (Tunísia) (In operation)
Stations / Stops (1)
- Terminal Mineral do Porto de Annaba (Argélia) & Porto de Fosfato de Sfax (Tunísia) · SNTF Fret / SNCFT Phosphates