In operation Water transport (ferries & boats) 100% verified sheet

Parnaíba Delta Waterways (Porto dos Tatus–Canárias–Tutóia) & Preguiças River Boats (Barreirinhas–Caburé–Atins, Piauí/Maranhão)

Parnaíba / Ilha Grande / Barreirinhas / Tutóia · PI/MA () — Brasil

Passenger waterway network between Piauí and Maranhão: links Porto dos Tatus (Parnaíba, PI) to Canárias, Caju Island and Tutóia across the Parnaíba River Delta, and connects Barreirinhas to Caburé and Atins along the Preguiças River in Lençóis Maranhenses.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Cooperativas de Lanchas Voadeiras e Barcos Regionais do Delta do Parnaíba e Rio Preguiças
Opened
1978
Operational/planned length
145 km
Lines
2
Stations / Stops
5
Weekday ridership
6,400 (2026)
Verified investment
Upcoming deliveries & expansion
Sinalização náutica nos igarapés do Delta das Américas e foz do Rio Preguiças

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (2)

  • (In operation)
  • (In operation)

Stations / Stops (5)

  • Porto dos Tatus (Ilha Grande de Santa Isabel / Delta do Parnaíba, PI)
  • Píer da Baía das Canárias / Ilha do Caju (Delta do Parnaíba, MA/PI)
  • Porto de Tutóia (Delta Ocidental do Parnaíba, MA)
  • Beira-Rio de Barreirinhas — Rampa do Rio Preguiças (Lençóis Maranhenses, MA)
  • Píer de Caburé / Canto do Atins — Foz do Rio Preguiças (Barreirinhas, MA)

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.