Zadar & Šibenik Archipelago Ferries and Catamarans — Jadrolinija, Krilo & Miatours (Zadar – Preko/Ugljan, Dugi Otok, Silba & Mali Lošinj; & Šibenik – Zlarin, Prvić & Kaprije, Croatia)
Zadar (Porto de Gaženica e Centro Histórico / Poluotok), Preko (Ilha de Ugljan), Brbinj e Sali (Ilha de Dugi Otok), Ilha de Silba e Mali Lošinj; e Šibenik, Ilha de Zlarin, Prvić e Kaprije (Dalmácia Setentrional, Croácia) · Zadarska / Šibensko-kninska županija () — Croácia
In northern Dalmatia (Croatia), the archipelagos of Zadar and Šibenik encompass hundreds of islands — many completely car-free — served by a dense network of ro-pax ferries and fast catamarans overseen by the Croatian Coastal Liner Shipping Agency (AZOLPP). In Zadar, operations are split between two terminals: right on the historic walled peninsula (Poluotok, beside the famous Sea Organ), passenger launches (Line 409 Zadar–Ošljak–Preko) and high-speed catamarans operated by Jadrolinija, Miatours and TP Line depart for Sali and Božava on Dugi Otok, the car-free islands of Silba and Olib, and onward to Mali Lošinj; while at the modern Zadar Gaženica terminal (3 km south, directly linked to the A1 motorway), large ro-pax vehicle ferries operate Line 431 (Croatia's busiest island ferry route, carrying over 2 million passengers annually to Preko on Ugljan Island in 25 minutes) and Line 434 to Brbinj on Dugi Otok. Further south, ferries and catamarans depart Šibenik Harbour (adjacent to Šibenik railway station) for the car-free islands of Zlarin, Prvić, Kaprije and Žirje.
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Jadrolinija (Estatal Nacional Croata: Linhas de Zadar Gaženica/Poluotok e Šibenik), Kapetan Luka — Krilo, Miatours (Catamarãs Princ Zadra e Mia) & TP Line
- Opened
- 1947 (Fundação da Jadrolinija; inauguração do moderno terminal ro-pax e de cruzeiros de Zadar Gaženica em 2015)
- Operational/planned length
- 240 km
- Lines
- 2
- Stations / Stops
- 4
- Weekday ridership
- 18,200 (2026)
- Verified investment
- € 48 milhões (construção do grande complexo portuário multimodal de Zadar Gaženica e renovação da frota de catamarãs e ferries para as ilhas de Zadar e Šibenik)
- Upcoming deliveries & expansion
- Introduction of Jadrolinija's first 100% battery-electric passenger ferries on the short-sea Zadar–Preko and Šibenik–Zlarin–Prvić routes.
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (2)
- (In operation)
- (In operation)
Stations / Stops (4)
- Terminais Marítimos de Zadar Gaženica (Ro-Pax) e Poluotok / Centro Histórico (Catamarãs, Zadar, Croácia)
- Porto de Ferries de Preko — Ilha de Ugljan (Linha 431 Jadrolinija, Condado de Zadar, Croácia)
- Portos de Brbinj e Sali (Ilha de Dugi Otok) e Ilha Sem Carros de Silba (Arquipélago de Zadar, Croácia)
- Porto de Ferries de Šibenik (Vrulje) e Píeres Insulares de Zlarin, Prvić e Kaprije (Dalmácia, Croácia)
Editorial coverage
Primary sources and references for this sheet
- OpenStreetMap Contributors — Rail Alignments and Stations (ODbL 1.0 License) — OpenStreetMap Foundation (Consulted on: 2026-11-11)