In operation Metro / Subway 100% verified sheet

French VAL Automated Metros (Lille, Toulouse & Rennes)

Lille, Toulouse e Rennes · Hauts-de-France / Occitanie / Bretagne (Lille, Toulouse e Rennes) — França

⚠️ Schematic/approximate alignment (planned or under construction)

On April 25, 1983, Lille inaugurated the VAL (Véhicule Automatique Léger) system, becoming the world's first fully driverless urban subway with platform screen doors, later adopted by Toulouse (Lines A, B and C under construction) and Rennes (Lines A and B).

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Ilévia (Lille) / Tisséo (Toulouse) / STAR Keolis (Rennes)
Opened
1983-04-25
Operational/planned length
106.3 km
Lines
6
Stations / Stops
128
Weekday ridership
890,000 (2024)
Verified investment
data being verified
Upcoming deliveries & expansion
Construction of Toulouse Metro Line C (27 km and 21 stations linking Colomiers, Airbus hubs, Matabiau and Labège).

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (3)

  • Metrô de Toulouse Linha C (Colomiers – Blagnac Airbus – Matabiau – Labège — 27 km em obras) (In operation)
  • Metrô de Lille Linha 1 VAL (1º Metrô Automático do Mundo — CHU Eurasanté a Quatre Cantons) (In operation)
  • Metrô de Toulouse Linha A VAL (Basso Cambo – Capitole – Marengo SNCF – Balma-Gramont) (In operation)

Stations / Stops (3)

  • Gare Lille Flandres (Berço do Metrô VAL 1983) · Metrô de Lille Linhas 1 e 2 VAL
  • Jean-Jaurès (Intercâmbio Central de Toulouse) · Metrô de Toulouse Linhas A e B VAL
  • Marengo – SNCF (Toulouse Matabiau) · Linha A & Futura Linha C (Em obras)

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: 2026-11-11 · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.