In operation Metro / Subway 100% verified sheet

Buenos Aires Underground — Subte (Lines A, B, C, D, E & H)

Buenos Aires · CABA (Área Metropolitana de Buenos Aires (AMBA)) — Argentina

Opened on December 1, 1913 with Line A (Plaza de Mayo–Plaza Miserere), the Buenos Aires Subte is the oldest underground metro system in Latin America, the Southern Hemisphere, and the entire Spanish-speaking world, operating 6 lines (A, B, C, D, E, and H) and 90 stations.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Emova Movilidad / Subterráneos de Buenos Aires (SBASE)
Opened
1,913
Operational/planned length
56.7 km
Lines
6
Stations / Stops
90
Weekday ridership
950,000 (2025)
Verified investment
data being verified
Upcoming deliveries & expansion
data being verified

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • Subte de Buenos Aires (Linhas A, B, C, D, E e H) (In operation)

Stations / Stops (2)

  • Plaza de Mayo / Bolívar / Catedral (Subte Linhas A, D e E) · Linhas A, D e E
  • Obelisco — 9 de Julio / Carlos Pellegrini / Diagonal Norte (Subte B, C e D) · Linhas B, C e D

Editorial coverage

Primary sources and references for this sheet

  • — Comisión Nacional de Regulación del Transporte (CNRT) / Subterráneos de Buenos Aires (SBASE) (Consulted on: )

Fact sheet updated on: 2026-11-12 · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.