In operation Conventional rail 100% verified sheet
Pemba Island & Mafia Archipelago — Clove Port Tramways of Chake-Chake / Wesha Harbor, Mkoani & Kilindoni (Zanzibar Archipelago, Tanzania)
Chake-Chake / Wesha / Mkoani (Ilha de Pemba) & Kilindoni (Ilha de Mafia) · Arquipélago de Zanzibar / Pwani (Oceano Índico Tanzaniano) () — Ilha de Pemba e Arquipélago de Mafia (Tanzânia)
Historic port rail and maritime slipway system on Pemba Island (the 'Green Island' of the Zanzibar Archipelago, world center of clove production) and Mafia Island in the Tanzanian Indian Ocean, linking Chake-Chake to Wesha Harbor and Mkoani Pier.
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- Zanzibar Ports Corporation (ZPC — Wesha & Mkoani Ports, Pemba) & Tanzania Ports Authority (Kilindoni, Mafia Island)
- Opened
- 1912 / 1928 (Vias férreas portuárias do cravo-da-índia entre Chake-Chake e o Porto de Wesha na Ilha de Pemba)
- Operational/planned length
- 7.5 km
- Lines
- 1
- Stations / Stops
- 2
- Weekday ridership
- 1,100 (2026)
- Verified investment
- US$ 35 milhões (modernização dos terminais portuários insulares de Wesha e Mkoani na Ilha de Pemba)
- Upcoming deliveries & expansion
- Upgrade of the Wesha and Mkoani rail-maritime piers for high-speed ferry integration across the Pemba Channel.
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (1)
- Corredor Portuário do Cravo Chake-Chake – Porto de Wesha – Mkoani (Ilha de Pemba, Tanzânia) (In operation)
Stations / Stops (2)
- Porto de Wesha / Chake-Chake (Ilha de Pemba — Zanzibar, Tanzânia) · Corredor Portuário da Ilha de Pemba
- Terminal Marítimo-Portuário de Mkoani (Ilha de Pemba, Tanzânia) · Corredor Portuário da Ilha de Pemba
Editorial coverage
Primary sources and references for this sheet
- OpenStreetMap Contributors — Rail Alignments and Stations (ODbL 1.0 License) — OpenStreetMap Foundation (Consulted on: 2026-11-11)