In operation Metro / Subway 100% verified sheet

CCR Metrô Bahia (Salvador and Lauro de Freitas Subway)

Salvador / Lauro de Freitas · BA (Região Metropolitana de Salvador) — Brasil

CCR Metrô Bahia (Salvador and Lauro de Freitas Subway)
Photo: Luan / Wikimedia Commons · License: cc-by-sa

Landmark rapid transit expansion in Brazil: launched commercial service in June 2014 and reached 38 km and 22 stations across two lines (Line 1 Lapa–Águas Claras and Line 2 Acesso Norte–Airport), seamlessly integrated with metropolitan bus terminals.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
CCR Metrô Bahia
Opened
2014-06-11
Operational/planned length
38 km
Lines
2
Stations / Stops
22
Weekday ridership
400,000 (2025)
Verified investment
R$ 1,52 bilhão (expansão Linha 1 Tramo 4 Campo Grande/Barra anunciada pelo Governo da Bahia e Novo PAC)
Upcoming deliveries & expansion
Southward extension of Line 1 (Lapa – Campo Grande) and physical/fare integration with the Salvador Light Rail at Águas Claras and Bairro da Paz.

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (2)

  • Linha 1 (Lapa – Águas Claras) (In operation)
  • Linha 2 (Acesso Norte – Aeroporto) (In operation)

Stations / Stops (9)

  • Lapa · Linha 1
  • Acesso Norte · Linha 1 / Linha 2
  • Águas Claras · Linha 1
  • Aeroporto (Salvador / Lauro de Freitas) · Linha 2
  • Estação Campo da Pólvora · Linha 1 (Metrô Bahia)
  • Estação Brotas · Linha 1 (Metrô Bahia)
  • Estação Rodoviária · Linha 2 (Metrô Bahia)
  • Estação Mussurunga · Linha 2 (Metrô Bahia)
  • Estação Águas Claras · Linha 1 (Metrô Bahia)

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: 2026-11-11 · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.