In operation Metro / Subway 100% verified sheet

Madrid Metro & Light Rail Network (Metro de Madrid)

Madri · Comunidade de Madri (Área Metropolitana de Madri) — Espanha

Europe's third-largest metro network by route length (296.6 km across 13 subway lines plus 3 light rail lines), featuring two major orbital loops: Line 6 Circular and the 41 km Line 12 (MetroSur) serving five southern suburban cities.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Metro de Madrid S.A. / Metros Ligeros de Madrid
Opened
1919-10-17
Operational/planned length
296.6 km
Lines
13
Stations / Stops
302
Weekday ridership
2,250,000 (2024)
Verified investment
data being verified
Upcoming deliveries & expansion
Full GoA4 automation of Circular Line 6, Line 11 Diagonal extension and Line 5 extension to Barajas Airport.

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (4)

  • Linha 1 (Pinar de Chamartín – Chamartín – Sol – Atocha – Valdecarros) (In operation)
  • Linha 6 Circular (Anel Metroviário Central de Madri) (In operation)
  • Linha 8 Expressa (Nuevos Ministerios – Feria de Madrid – Aeropuerto Barajas T4) (In operation)
  • Linha 12 MetroSur (Anel Subterrâneo de 41 km — Alcorcón, Móstoles, Fuenlabrada, Getafe e Leganés) (In operation)

Stations / Stops (5)

  • Puerta del Sol (Marco Zero de Madri — Metrô & Cercanías) · Linhas 1 / 2 / 3 & Cercanías C-3/C-4
  • Nuevos Ministerios (Hub Paseo de la Castellana) · Linhas 6 / 8 / 10 & Cercanías
  • Avenida de América (Intercambiador 4 Linhas) · Linhas 4 / 6 / 7 / 9
  • Aeropuerto T4 (Barajas) · Linha 8 / Cercanías C-1 e C-10
  • Móstoles Central (Anel MetroSur L12) · Linha 12 MetroSur & Cercanías C-5

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: 2026-11-11 · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.