In operation High-speed rail 100% verified sheet
Beijing–Harbin HSR & Northeast High-Speed Network (Shenyang–Dalian–Qiqihar)
Pequim – Shenyang – Dalian – Changchun – Harbin – Qiqihar · Pequim–Liaoning–Jilin–Heilongjiang (Corredor Nordeste da China (Manchúria)) — China
World's first high-speed railway network engineered for extreme subzero climates (-40 °C). Links Beijing with Shenyang, Changchun, Harbin, Qiqihar and Mudanjiang, plus the Shenyang–Dalian coastal branch.
Georeferenced system alignment
© OpenStreetMap contributors (ODbL 1.0)
Technical and operational indicators
- Operator / Concession
- China State Railway Group (CR Beijing / CR Shenyang / CR Harbin)
- Opened
- 2012-12-01
- Operational/planned length
- 2,580 km
- Lines
- 3
- Stations / Stops
- 38
- Weekday ridership
- 460,000 (2024)
- Verified investment
- data being verified
- Upcoming deliveries & expansion
- Operation of extreme-cold-resistant (-40 °C) Fuxing CR400BF-GZ trainsets at 350 km/h.
Mapped lines and stations (OpenStreetMap / ODbL)
Lines (3)
- Jingha HSR & Haqi HSR (Pequim – Chengde – Shenyang – Changchun – Harbin – Daqing – Qiqihar) (In operation)
- Ramo Litorâneo Qinshen & Hadal HSR (Tianjin – Qinhuangdao – Shenyang – Anshan – Dalian) (In operation)
- Corredor Leste de Heilongjiang e Jilin (Harbin – Mudanjiang – Yanji – Changchun) (In operation)
Stations / Stops (4)
- Estação de Shenyang North (沈阳北站) · Jingha HSR
- Estação de Changchun West (长春西站) · Jingha HSR
- Estação de Harbin West (哈尔滨西站) · Jingha HSR
- Estação de Dalian North (大连北站) · Hadal HSR
Editorial coverage
Primary sources and references for this sheet
- National Railway Administration (NRA) & Ministry of Transport of the PRC — Statistical Bulletin 2024/2025 (159,000 km total rail, 45,000 km HSR) — National Railway Administration of China (NRA) / MOT PRC (Consulted on: 2026-11-12)
- OpenStreetMap Contributors (ODbL 1.0) & Natural Earth 10m Railroads Public Domain — Global Railway Cartographic Base — OpenStreetMap Foundation / Natural Earth (Consulted on: 2026-11-12)