In operation High-speed rail 100% verified sheet

AVE Northeast Corridor (Madrid – Zaragoza – Barcelona – Figueres/France, 310 km/h)

Madri – Guadalajara – Zaragoza – Lleida – Tarragona – Barcelona – Girona – Figueres · Madri / Aragão / Catalunha (Corredor Nordeste Ibérico e Conexão Pirenaica) — Espanha

Iberia's flagship high-speed rail artery (804 km in standard gauge to the French border at the Perthus Tunnel): links Madrid Puerta de Atocha to Barcelona Sants in 2h30 at up to 310 km/h, showcasing open-access competition between Renfe AVE/Avlo, Iryo and Ouigo.

Georeferenced system alignment

© OpenStreetMap contributors (ODbL 1.0)

Technical and operational indicators

Operator / Concession
Adif Alta Velocidad (Operadoras: Renfe AVE/Avlo, Iryo e Ouigo España)
Opened
2003-10-11
Operational/planned length
804 km
Lines
1
Stations / Stops
9
Weekday ridership
65,000 (2024)
Verified investment
data being verified
Upcoming deliveries & expansion
Completion of the Barcelona-La Sagrera intermodal megastation and ERTMS upgrades.

Mapped lines and stations (OpenStreetMap / ODbL)

Lines (1)

  • AVE Madri–Zaragoza–Barcelona–Figueres/França (804 km, 310 km/h) (In operation)

Stations / Stops (6)

  • Madrid Puerta de Atocha – Almudena Grandes (Terminal AVE) · AVE Nordeste, Sul e Levante
  • Zaragoza-Delicias (Estação Intermodal AVE) · AVE Madri–Barcelona
  • Camp de Tarragona (AVE) · AVE Madri–Barcelona
  • Barcelona-Sants (Principal Hub Ferroviário da Catalunha) · AVE / Iryo / Ouigo / TGV / Rodalies / Metrô L3 e L5
  • Girona (AVE Subterrâneo) · AVE Barcelona–Figueres–França
  • Figueres-Vilafant (Fronteira AVE/TGV Pireneus) · AVE Espanha–França

Editorial coverage

Primary sources and references for this sheet

Fact sheet updated on: 2026-11-11 · Geographic data © OpenStreetMap contributors (ODbL 1.0 license) · Rendered with MapLibre GL JS · Open tiles by OpenFreeMap / CARTO.